Question 246:
A network engineer wants to decrease the convergence time of a network that is running integrated IS-IS as an IGP, at the expense of bandwidth and CPU usage. Which two configuration tasks achieve this goal? (Choose two.)
Answer options:
A. Configure the hold time to be 1 second. B. Configure the hello interval to be minimal. C. Ensure that hello-padding is disabled. D. Ensure that the hello multiplier is set to 3. E. Configure the hello multiplier to be 3.