ExamQuestions.com

Register
Login
Configuring and Operating Microsoft Azure Virtual Desktop (AZ-140) Exam Questions

Microsoft

Configuring and Operating Microsoft Azure Virtual Desktop (AZ-140)

67 / 105

Question 67:

Which of the following metrics represents the maximum duration of time allowable for a restoration process to take place i.e. the duration of time within which the business process must be restored after the disaster to avoid any unacceptable or undesired consequences?

Answer options:

A.RPO (Recovery Point Objective)
B.RTO (Recovery Time Objective)
C.RMO (Recovery Mode Objective)
D.Retention period