Question 61:

You plan to apply a patchset to a RAC database running on a two-node cluster. ✑ The cluster has this configuration: ✑ Grid infrastructure release 12.1.0.1.0 ✑ RAC database release 12.1.0.1.0 ✑ All software installed on local file systems ✑ The database is deployed on ASM disk groups. Examine this list of possible tasks (see exhibit). Exhibit: 
image
Identify the required tasks in the correct order to apply the patchset with the least amount of down time. 

Answer options:

A. 1, 3, 2, 5 and 8
B. 3, 2, 5 and 8
C. 1, 2, 3, 5 and 8
D. 3, 2, 6 and 8
E. 3, 2, 5, 2 and 8